header |
|
#21
|
||||
|
||||
|
[quote=Skyskiguy;892433]
Quote:
__________________
- Jeff 1994 205, LT1 |
|
#22
|
|||
|
|||
|
An update on the brake overhaul on my trailer. I just put in an order for the items listed below from CalTrailer. If I'm going to replace the actuator and the calipers, I might as well go ahead and replace the lines to ensure there's no corrosion material left to foul up the brakes in the future. I'm going to turn the rotors. As soon as these parts come in I'm going to have my local weld shop fab the new housing to the existing hinge-piece.
Something else I decided to do while I'm working on the trailer is to replace the trailer pads located on the fenders. One had fallen off and the others were cracking badly. I decided to replace them with what Sk8solomon had done, all-brite aluminum diamond plate. I took the old pads in and they're cutting them using a flowjet. Material and labor is going to run me about $150. I intend to pop-rivit them to the fenders rather than glue them on. I'll be posting pictures during the installation. UFP A60 ACTUATOR / INNER MEMBER DISC ON ONE AXLE(34043) UFP ACTUATOR HOUSING / OUTER MEMBER RAW LONG (34066) BRAKE LINE KIT / ONE AXLE BRAKES KODIAK 225 CALIPERS / PADS
__________________
2005 ProStar 197 Tournament Team #8 of 100 Last edited by erervin; 01-03-2013 at 08:45 AM. |
|
#23
|
|||
|
|||
|
Well today I was able to install the Kodiak 225 calipers, new brake hoses, and run and bend the new steel brake lines. I do not have the actuator housing back from the weld shop to finish up, but it's getting closer.
__________________
2005 ProStar 197 Tournament Team #8 of 100 |
|
#24
|
|||
|
|||
|
Completed
Finally was able to finish the brake overhaul last night. I received the new outer housing and had a weld shop fabricate this old swing points to the housing. I put a fresh coat of paint on it and while it was drying I secured the new brake lines to the frame with rubber line fasteners. Everything fit together as if it were a new Reliable replacement. Filled chamber with DOT3 fluid and going to let gravity do its thing over the weekend. Will finish bleeding the lines Sunday night and my plan is to take it out Monday evening for the 2013 maiden voyage.
Spent about $600 total on the trailer over winter; including new diamond plate skid pads, brake job, new bunks and carpet. Put a fresh coat of wax on the boat and trailer and ready to go.
__________________
2005 ProStar 197 Tournament Team #8 of 100 |
![]() |
| Thread Tools | |
| Display Modes | |
|
|