header |
|
#41
|
|||
|
|||
|
Tacked the supports on and it is much more sturdy than I though it would be tacked together. Hoping it will even get more stiff when I finish weld it. I am going to start on a template for the canvas this weekend if I have time.
![]() ![]() |
|
#42
|
|||
|
|||
|
Didn't get anything done during Christmas time due to family and friends, but will get going soon.
|
|
#43
|
|||
|
|||
|
The welding is all finish and I could not be happier. I was worried about the lateral movement of the rack and it is solid as a rock. Solid enough to have 2 guys do chin ups on at the same time.
![]() I am in the process of polishing it to match the tower as close as possible. It is looking really good on the small section I have done. I am starting out with 150 grit emory cloth to get out the imperfections, then taking a Maroon (300) grit scotch brite pad and wrapping it around the tube and gripping it really tight and twisting. It leaves very small uniform scratches perpendicular to the tube. I will post up a close up to show the finish. Not sure what I will use to clear coat it. Was going to have it anodized, but I think I changed my mind to just clearcoating it. |
|
#44
|
|||
|
|||
|
double post
|
|
#45
|
||||
|
||||
|
Sweet *** sweet man
__________________
97 maristar 200 |
|
#46
|
||||
|
||||
|
nice project and it appears well thought out. I look forward to seeing the final product.
|
|
#47
|
||||
|
||||
|
Outstanding!
![]()
__________________
[>-----Ride'n The Wild West In A MasterCraft-----> |
|
#48
|
|||
|
|||
|
Nice work can't wait to see the canvas.
|
|
#49
|
|||
|
|||
![]() This is why no progress has been made. Last edited by Sodar; 01-14-2013 at 04:08 PM. |
|
#50
|
||||
|
||||
|
No photo showing. ?
__________________
Jeff |
![]() |
| Thread Tools | |
| Display Modes | |
|
|