Go Back   TeamTalk > Maintenance Tips, How-tos and Refurbishing Topics > Appearance

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 12-07-2012, 02:37 PM
bjames's Avatar
bjames bjames is offline
MC Devotee
 
Join Date: Jul 2011
Boat: 2009 X-Star LY6
Location: Alberta, Canada
Posts: 1,106
X-Star is getting wrapped on Monday

My new to me 2009 Star is getting a new wrap installed on Monday. If everything goes as planned, I should be picking it up next weekend. Im very excited, but depressed that I wont be able to use it for another 6 months

I have always loved the 2009/10 PWT graphics, so I took that and added a MC sheild to help transition where the white gel meets the black. Also the front tower arms are being wrapped (not shown in the pic).

BTW, Anyone looking at doing a wrap, no one beats Serlin, Josh is fantastic to deal with.

Name:  Xstar Comp1-FINAL.jpg
Views: 1821
Size:  36.5 KB
__________________
Current: 2009 X-Star, Indmar 6L, 400hp, ZFT3 tower. c/w 1/9 scale R/C PWT X-Star

Owned:
2012 X25
2011 X25
2009 Moomba LSV
2009 Moomba Outback V
2008 Monterey FS180
Pelican 4 set paddle boat
plastic tug boat when I was 4
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT -4. The time now is 05:42 PM.