Go Back   TeamTalk > General MasterCraft Topics > General Discussion

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 11-29-2012, 10:52 PM
AZX45OD's Avatar
AZX45OD AZX45OD is offline
TT Enthusiast
 
Join Date: Feb 2011
Boat: 2013 X-30 6.0L Red w/Silver Flake
Location: Southwest
Posts: 284
My Factory Tour on Monday

Well, I can mark an item off of my bucket list! My wife and I tripped to Venore on Monday to see our X30 in production and have the factory tour. Kudos to Josh (head of marketing) for taking his time with us and giving us a great tour. The whole deal was awe-inspiring. Our X30 (red and silver flake pictured below) was having the gel coat inspected prior to rolling down the assembly line. They told us that it only takes about 1.5 days to get finished up once it starts down the line. He said to build a boat it takes about 3 weeks. The first two weeks consists of ordering materials. The actual build is only 5-7 days. 3-4 days with molds and fiberglass, etc. Then a day and a half for actually assembly.
Attached Images
  
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT -4. The time now is 03:22 PM.