Quote:
Originally Posted by JohnnyB
Fyi...i have 800 feet of gravel drive and tack welded a slotted 2" schd 80 around my blade so I can avoid digging up gravel..skims over the top and no spring raking
Sent from my Motorola RAZR MAXX using Tapatalk 2
|
I had read about guys doing this and really never had a need before now but will be doing this soon. I planned to create slit the schedule 80 enough to slide over the cutting edge and then attach some nuts to it so that I can thread a bolt in against the cutting edge to hold it in place and make it easily removable once I am done with my drive.
We will see how it works!