My Factory Tour on Monday

Well, I can mark an item off of my bucket list! My wife and I tripped to Venore on Monday to see our X30 in production and have the factory tour. Kudos to Josh (head of marketing) for taking his time with us and giving us a great tour. The whole deal was awe-inspiring. Our X30 (red and silver flake pictured below) was having the gel coat inspected prior to rolling down the assembly line. They told us that it only takes about 1.5 days to get finished up once it starts down the line. He said to build a boat it takes about 3 weeks. The first two weeks consists of ordering materials. The actual build is only 5-7 days. 3-4 days with molds and fiberglass, etc. Then a day and a half for actually assembly.