Let's call it 14 hours!
Day 1: Layout started at 7am with holes drilled by 8:30am. Materials were delivered, separated and layed out by 10am. Since inspector was not due until late afternoon, the guys left only to return at 11:30 to meet the inspector and re-start again by noon. Day 1 ended with all framing complete at 4pm (7 hours total)

Day 2: Crew arrived at 7am and roof was on by 8:30am when the rain began. They put in the windows and door and some trim and then left by 10am due to rain. (3 hours total)

Day 3: Arrived at 7am and put on the sides, soffit and trim, cleaned up the site, loaded their gear and rolled out the drive at 11am (total 4 hours)

Amazing is all I can say as I would still be out there laying it out!!!