View Full Version : started my winter projects

01-04-2010, 07:19 PM
I started my winter projects on my 91. sorry no pics right now....

so far I have replaced the Fuel sender with the WEMA SSS unit and I am in the process of relocating the battery to the cooler location. I have drilled out the drain hole to 1 1/3" so I can run a pipe through and seal it with black sealant for a clean look.

after that is finished, I am going to replace my head gaskets and add a new intake manifold then a new CNC prop.

01-04-2010, 07:22 PM
Very worthwhile projects. Have you decided which prop to go with?

01-05-2010, 09:18 PM
I think i am going to go with the OJ 454 CNC 4 blade, it has been proven over and over.
but, I think im also going to test the new (not on the site yet) Acme 1749-13.50X17.50VL3B 1.125 .150 cup three blade for Bill Weeks. the lastest attempt at a 3 blade for the powerslot. and supposed to have a lower/soft wake and rooster tail, same or better holeshot and better top end than their 4 blade that is currently out for the powerslot.

01-17-2010, 06:34 PM
Finished most of my winter projects today. But my camera died so no pictures. sorry :rolleyes:
But the Fuel Sender is finished, moved the battery to the cooler location under the OB seat and finished up the battery box straps today. all that is left is replacing the head gaskets and getting me a new CNC prop and we are done!

...... for now.... :D

01-18-2010, 01:13 AM
I guess we will just patiently await pictures of the battery relocation.

01-18-2010, 08:09 PM
I know, I'm sorry... LOL
I will get pictures as soon as I can.

01-19-2010, 12:00 AM
So the camera died. You could just get out the crayons and scan your pictures in. Better to have the work done and no pictures than to have a new camera with nothing to take pictures of. Oh jeez................I feel the picture of the bear pooping coming soon.

01-19-2010, 01:23 PM
LOL :rolleyes::cool: