Plug 'n Play Ballast System
[9/27/2011]
The Plug 'n Play ballast system gives consumers the ability to mix and match ballast loads as an option on V-Series boats. If ordered as an option, the plumbing for the Plug 'n Play will come from the factory ready to install bags forward and aft. MasterCraft…
First 50 Hours Of Operation
[5/11/2011]
The first 50 hours of operation are the most important to your boat. Proper break-in will ensure maximum performance and the longest possible power-train life. The break-in period allows moving parts within the engine and transmission to wear-in properly.…